Skip to content
PROJECT · MUD SYSTEMS · 2024

16,000 BBL Mud System — H&P Jafurah

We provided engineering and manufacturing support across eight mud-tank system sites supporting H&P drilling operations in the strategic Jafurah field.

MUD SYSTEM CAPACITY
0BBL
MUD-TANK SYSTEM SITES
0
DRILLING OPERATOR
H&P
PROJECT YEAR
2024
16,000 BBL Mud System — H&P Jafurah

The Jafurah field represents a demanding operating environment requiring dependable drilling infrastructure and disciplined project execution.

As part of the H&P drilling program, we contributed engineering and manufacturing capability to a 16,000 BBL mud system, and we worked across eight mud-tank system sites.

The program also included 2,000 BBL mud-system projects, which showed how we support different system configurations and project requirements within a broader drilling program.

SCOPE OF WORK

Integrated Fabrication & Field-Ready Execution

Mud-tank system fabrication

We carried out fabrication supporting the mud-tank system configuration and the associated drilling-fluid storage requirements.

Structural assemblies

We manufactured the structural steel assemblies supporting the system, including platforms and associated access structures.

Piping integration

We integrated the piping and associated connections within the overall mud-system configuration.

Inspection & quality control

We ran inspection and quality control throughout fabrication and assembly, to hold conformity with project requirements and field-readiness.

Site delivery & execution

We prepared and delivered the completed fabricated components and assemblies for demanding drilling-site deployment.

Project Gallery

Photographed across the programme, from the fabrication bay through to systems standing ready for site.

Fabrication activities supporting the Jafurah mud-system program
Mud-tank system fabrication
1 / 3

Demonstrating Scalable Industrial Capability

The program showed how we scale execution, hold quality control and take on complex drilling-system work, and it strengthened our position with leading drilling organizations in the Kingdom.

Scalable execution

We can take part in large-volume mud-system programs spanning multiple sites.

Quality-focused delivery

We hold disciplined quality control and inspection throughout project execution.

Field readiness

We prepare fabricated systems and components for demanding drilling operations.

Industrial development

Experience that advanced our industrial development and strengthened our standing with leading drilling organizations in the Kingdom.

SETCCO plant at dusk — wide view

Planning Your Next Drilling-System Project?

We combine engineering capability, controlled manufacturing, structural fabrication, system integration and project execution to support demanding oil and gas drilling requirements.

Request a quote