6,000 BBL Mud System — ADC
We designed, fabricated and assembled a complete 6,000 BBL mud system for Arabian Drilling Company, covering mud tanks, structural assemblies, piping and platforms.
- BBL CAPACITY
- 0
- SCOPE WORKSTREAMS
- 0
- CLIENT / END USER
- ADC
- DELIVERY YEAR
- 2022

We engineered the system to Arabian Drilling Company's rig arrangement, setting tank capacity, pump positions and access routes to suit their operating configuration rather than a standard layout.
We held the full scope: material procurement, in-house fabrication of tanks and structural steel, piping integration, platform and access steel, and final assembly with inspection prior to release.
Tanks, Structure & Piping Under One Scope
Mud tanks
We fabricated baffled tanks from certified plate, with fittings and internal arrangements to specification.
Structural assemblies
We fabricated support steel, frames and load-bearing assemblies and trial-fitted them in our yard.
Piping
We integrated suction, discharge and transfer piping with valves and manifolds into the package.
Platforms
We built elevated working platforms, stairs, walkways and handrail systems.
Procurement
We procured certified material and equipment against the approved specification.
Quality inspection
We recorded material traceability, weld inspection and dimensional checks at each hold point.
Project Gallery
Fabrication through to the delivered system on the rig site.

What The Project Demonstrated
Delivered as one package
We held procurement through final assembly under a single scope, which removed interface risk between suppliers.
Rig-specific configuration
We developed the layout against ADC's arrangement, so site work was limited to positioning and connection.
Reference for scale
The programme built capability we carried into later large-volume system work.

Planning Similar Scope?
Send the specification or rig arrangement and we will return a scope, schedule and price.